Landers Shute WTP Lime Upgrade
Landers Shute WTP Lime Upgrade
Built in 1989 the Landers Shute Water Treatment Plant (WTP) supplies drinking water from Baroon Pocket Dam to parts of the Sunshine Coast.
To improve the plant’s capacity to cope with water quality challenges caused by significant rainfall events a multi-staged lime storage and dosing upgrade was commissioned late 2016.
Prospect Solutions was engaged to perform and completed detailed engineering works, including design and detailing of the 100 tonne Lime Storage Silo, Support Structure, Access Tower and related Pipework.
Services performed included:
- Preliminary Layout and Design
- Detailed Engineering
- 3D Design Model
- Engineering Drawings
- Shop Fabrication Drawings for all Structure, Platework and Piping.